- Porto de Cabedelo (Brasil)
- 2021-2022
- Hydraulic and mechanical dredging of consolidated and unconsolidated material
- Porto do Açu (Brasil):
- 2013-2015
- Dredging and disposal of 250,720 m³
- Breakwater foundation placement – 1,652,890 t
- Filling of 88 concrete caissons
- Dismantling of the temporary breakwater
- Porto do Pecém (Brasil):
- 2015
- Dredging of 591,000 m³ and landfill for the expansion of the port of Pecém
- Porto de Imbetiba – Macaé (Brasil):
- 2017
- Hydraulic and mechanical dredging of 405,620 m³ of mud, sand and consolidated material
- Porto de Mar Del Plata (Argentina):
- 2017
- Hydraulic and mechanical dredging of 400,000 m³
- Bahia de Chilota (Chile)
- 2013-2014
- Hydraulic dredging 50,300 m³ of sand and gravel
- Porto de Chaiten (Chile):
- 2012
- Mechanical dredging of 50,000 m³ of sand and mud
- Puerto Coronel (Chile):
- 2012
- Mechanical Dredging of 13,000 m³
- Valparaiso (Chile):
- 2012
- Hydraulic dredging and landfill of 231,663 m³
- Mechanical dredging of 68,000 m³³
- Launching of 23,600 m³ of 500 kg revetment
- Puerto de Callao (Peru)
- 2013-2015
- Mechanical dredging of 360,000 m³
- Placement of rockfill to reinforce the slope
- Laying foundation for breakwater